New Metrodom building to be constructed in District 13

New Metrodom building to be constructed in District 13

16/08/2019

Our customers love the 13th District, and so do we. We love the neighborhood and therefore selected a plot there. Our newest residential building will be built at 33-41 Teve utca. The architectural design of this 200-apartment unit building is ongoing, while construction and sales are expected to begin in March next year.

More ...
This is what the community facilities of City Home phases H-K look like

This is what the community facilities of City Home phases H-K look like

Besides the impressive internal park and the garden pond, phases H-K of the City Home complex have been equipped with community facilities available only to the residents. There is a TV screen, table football, and a snooker table in the club room, 18 exercise machines have been installed in the gym, and additionally, comfortable resting places and lots of toys await residents in the baby playroom. The facilities will open once the surveillance cams and entrance systems have been installed, within just a few days. The images can already be seen in the photo gallery.

Time-lapse video on the construction process of City Home phases H-K

Time-lapse video on the construction process of City Home phases H-K

Technical handover of phase K of the City Home residential complex has taken place, practically bringing the entire H-K block to completion. Today with this video, we say goodbye to the video camera, which has broadcast the two and a half years of the construction process. If you are interested, you can now watch the activities of the past years in a one and a half minute video, just refer to this page on our website or access our YouTube channel.

New open/close sensors

New open/close sensors

We change the open/close sensors in our smart homes, the new devices are supplied by Sensative. The most important advantage of the new sensor is that it is perfectly flat and mounted on the window reveal facing part of the window profile, making it essentially invisible. As another feature, there is no need to replace batteries in the sensor, the built-in batteries supply energy for the entire 10-year lifespan of the device. The new sensors will debut in the buildings of City Home - Phase K, Metrodom Panoráma - Phase B, and Metrodom Park - Phase B.

New smart switches

New smart switches

The development of Metrodom's smart home system has been taken to a new level. Starting with buildings handed over in the second half of the year (Panoráma B, Park B, City Home K), Metrodom homes will be equipped with smart switches specifically optimized for Metrodom's own system. While the sleek, elegant design and touch sensitive glass interface remain, the technical content has been significantly improved, and from now on, the optional window shutter switches will also have a matching design.

Big size apartments now come with A/C preparations

Big size apartments now come with A/C preparations

Two-bedroom and bigger apartments in the City Home K project now come with A/C preparation free of charge. If you want to change the layout plan or the position of electricity outlets, we now also provide the relevant consultant's drawings at no expense to you. This special offer is available between February 26 and March 31 for new contracts.

68 homes within 2 minutes

68 homes within 2 minutes

City Home K

29/11/2017

City Home is still one of Metrodom's most popular condominiums, within 2 minutes of the start of sales more than 100 clients have expressed their interest in reserving a home. Numerous apartments have received seven-eight reservations which meant that overall 68apartments have already found their owners in the value of over 2 billion forints. 

Sales to start on November 28

Sales to start on November 28

City Home K

17/11/2017

The apartments of City Home phase K are now available on our website in the apartment finder complete with prices and layout plans, at the same time you can browse through our apartments on our storey layout plans as well. Sales will begin at 10 o’clock on the 28th of November. 

Prices available from Friday afternoon

Prices available from Friday afternoon

City Home K

16/11/2017

Apartments of the City Home phase K will be available on our website from Friday afternoon together with lay-out plans and prices. This is the final phase of the condominium and the last house at City Home to be handed over before the end of 2019 prior to future changes in VAT.  

Construction of phase “K” started

Construction of phase “K” started

City Home K

12/10/2017

We have started construction works on the final building (phase “K”) of the third large building block (containing phases H-I-J-K) of City Home. Excavation works will last until the end of the year allowing foundation works to begin next January. Handover of building K is expected to be in the third quarter of 2019. Please return to our website in November for information regarding the start of apartment sales. 

Half of the apartments sold immediately

Sales of City Home, Building J has begun 10:00 am today. Although we are used to a fast rate of sales of our apartments, the number of reservations has surprised us too. More than 120 registration emails were received over a period of only a few minutes, many wanted to buy multiple apartments. Half of all the 109 apartment units were sold in the first 2 and a half minutes of sales. We only have a few left of the most popular studios and 1 bedroom apartments.